EOL Test IntelligenceRelease Intelligence Dashboard
Release Intelligence Dashboard
Traceability, test intelligence, release control and enterprise visibility.
Total Tested
1,248
Passed
1,082
Failed
114
Hold / Rework
36
Scrap
16
Dispatch Allowed
1,066
Test Coverage – Requirement Wise
- Covered1148
- Partially Covered64
- Not Covered22
- Blocked14
Sampling Control Compliance
Short Functional Test (target 90%)90.4%
Long Functional Test (target 10%)9.6%
Sampling within tolerance. Audit-compliant for current shift.
Short Tests
1,128
Long Tests
120
Failure Intelligence – Top Breakdown
Step38
Parameter27
CAN Issue18
Equipment12
Model8
Shift6
Operator3
Line2
Pack-Level Test History
| Pack Serial No. | Test Plan | Branch | Result | Tested On | Station/ATE | Operator | |
|---|---|---|---|---|---|---|---|
| PK-314AH-26042607 | TP-...-001 / R07 | Short Functional | Pass | 26-Apr 10:51 | ATE-01 | Rajit Sharma | |
| PK-314AH-26042606 | TP-...-001 / R07 | Short Functional | Pass | 26-Apr 10:32 | ATE-01 | Rajit Sharma | |
| PK-314AH-26042605 | TP-...-001 / R07 | Short Functional | Fail | 26-Apr 09:18 | ATE-02 | Neha Kulkarni | |
| PK-314AH-26042604 | TP-...-001 / R07 | Long Functional | Pass | 26-Apr 08:56 | ATE-01 | Vikram Iyer | |
| PK-314AH-26042603 | TP-...-001 / R07 | Short Functional | Hold | 26-Apr 08:21 | ATE-02 | Neha Kulkarni | |
| PK-314AH-26042602 | TP-...-001 / R07 | Short Functional | Pass | 26-Apr 07:48 | ATE-01 | Rajit Sharma |
Release Decision Summary
- Released1066
- Hold / Rework36
- Failed114
- Scrap16
- Dispatch Allowed1066
Evidence Log Overview
CAN Transactions
84,219
Measurements
26,540
Threshold Checks
18,720
Failed Criteria
142
Recent Evidence
| Pack | Step | Source | Status |
|---|---|---|---|
| PK-...07 | Functional | CAN | Pass |
| PK-...06 | ACIR | DMM | Pass |
| PK-...05 | OCV | BMS | Fail |
| PK-...04 | Trace | Scanner | Pass |
Equipment Health & Utilization
ATE-01 Utilization86%
ATE-02 Utilization72%
DMM-01 Utilization64%
ACIR Tester58%
Calibration
All OK
Downtime (24h)
42 min
Comm Failures
3
Enterprise Integration Status
MES26-Apr 13:42Success
SAP26-Apr 13:40Success
Database26-Apr 13:42Success
Cloud Storage26-Apr 13:38Delayed
Customer Gateway26-Apr 12:55Success